Owner's Engineering Romania / Romania

Owner-side technical control across design, EPC interfaces and acceptance.

We represent project owners on the technical decisions that shape Romanian solar, wind and BESS delivery. The Owner's Engineering mandate can cover design review, EPC oversight, interface management, quality, change, grid readiness, testing and acceptance while preserving a clear owner decision record.

Discuss your project

The decision in front of you

Who is checking delivery from the owner’s side?

Owner's Engineering supports the beneficiary's technical governance. It is not automatically the statutory site-supervision role and does not replace designer, contractor or legally required responsible persons unless expressly contracted and qualified.

Our response

A clear position. A practical next step.

Reviews focus on compliance with owner requirements and project assumptions. Tests, defects, warranties and handover evidence are controlled before release.

What we do for you

We agree the depth of the review and the work needed for your decision. The scope can cover the following workstreams.

01

Owner's requirements

Performance criteria, design basis, interfaces, deliverables and acceptance philosophy.

02

Design review

Compliance, coordination, operability, maintainability and value-impacting comments.

03

Contractor oversight

Submittals, programme, procurement, RFIs, change, quality and technical meetings.

04

Interface management

OEM, civil, electrical, SCADA, substation, grid operator and owner responsibilities.

05

Quality surveillance

ITPs, inspections, NCRs, FAT/SAT, punch lists and corrective action.

06

Testing and acceptance

Commissioning, performance, documentation, defects and handover readiness.

From instruction to delivery

How we move your matter forward

Clear responsibilities, a documented position and actions tied to the next decision.

  1. 01

    Define authority

    Set owner requirements, review gates and reserved decisions.

  2. 02

    Control interfaces

    Track responsibilities, submittals, changes, risks and unresolved technical points.

  3. 03

    Protect acceptance

    Tie testing, defects and handover evidence to objective criteria.

First conversation

Start with the essentials

  • owner's requirements
  • design deliverables
  • EPC submittals
  • interface matrix
  • RFI log
  • change log
  • ITP
  • NCR register
  • handover dossier
Begin with a non-confidential summary and your timetable. We agree the document exchange after checking conflicts and the scope of the mandate.

Questions before you instruct us

What is Owner's Engineering?

It is independent technical representation for the project owner, covering requirements, design review, contractor oversight, interfaces, quality, testing and acceptance under an agreed scope.

Does the Owner's Engineer replace the EPC contractor?

No. The contractor remains responsible for design and delivery; the Owner's Engineer reviews, monitors and supports owner decisions.

Is Owner's Engineering the same as statutory site supervision?

Not automatically. Statutory roles and qualifications must be separately defined and appointed where Romanian law requires them.