Commissioning & completion / Romania

Turn testing, defects and performance into defensible completion evidence.

We support owners, investors and lenders through commissioning, performance testing and completion of Romanian solar, wind and BESS projects. The work connects test plans, grid compliance, contractual guarantees, defects, documentation and handover so acceptance decisions are supported by traceable evidence.

Discuss your project

The decision in front of you

Is the project ready to be accepted—and on what evidence?

Technical completion assessment addresses tests, performance and physical/documentary status. Legal COD, contractual entitlement, delay remedies and acceptance consequences require coordinated Energy Law advice.

Our response

A clear position. A practical next step.

Acceptance is tied to defined tests, thresholds and documentary evidence. Outstanding work is assessed by safety, output, programme and contractual consequence.

What we do for you

We agree the depth of the review and the work needed for your decision. The scope can cover the following workstreams.

01

Commissioning strategy

Systems, sequence, prerequisites, responsibilities, hold points and records.

02

Energisation and compliance

Operator interfaces, protection, control, models, tests and deviations.

03

Guarantee testing

Capacity, efficiency, availability, yield proxies, BESS response and acceptance thresholds.

04

Punch lists and remediation

Classification, ownership, deadlines, retesting and residual exposure.

05

Handover dossier

As-builts, manuals, certificates, test records, spares, training and registers.

06

Completion assessment

Evidence, exceptions, conditions, outstanding work and recommendation.

From instruction to delivery

How we move your matter forward

Clear responsibilities, a documented position and actions tied to the next decision.

  1. 01

    Define acceptance

    Map contractual and technical criteria into a controlled test and evidence matrix.

  2. 02

    Witness and trace

    Track prerequisites, results, deviations, defects and corrective action.

  3. 03

    Support the decision

    Report what is complete, conditional, remediable or not yet demonstrated.

First conversation

Start with the essentials

  • commissioning plan
  • system boundary matrix
  • energisation procedure
  • test scripts
  • performance guarantee
  • test report
  • punch list
  • as-built dossier
  • completion report
Begin with a non-confidential summary and your timetable. We agree the document exchange after checking conflicts and the scope of the mandate.

Questions before you instruct us

What is reviewed during renewable commissioning?

Prerequisites, procedures, system tests, grid compliance, performance guarantees, defects, retesting, records and handover documentation.

Is technical completion the same as contractual completion?

Not necessarily. Technical evidence informs the decision, while the contractual definition and legal consequences must be reviewed under the project documents.

Can completion be recommended with open defects?

Potentially, if the agreed criteria allow it and the defects are properly classified, secured, time-bound and do not undermine safety or required performance.

Your next step

Discuss your project

Tell us the issue, the parties involved and the decision date. We will agree the scope and next steps with you.